White Shaker Kitchen Remodel in Redmond, WA
This completed white shaker kitchen remodel in Redmond, WA transformed an older wood-cabinet kitchen with a coordinated cabinet layout, two Pental quartz surfaces, a glass tile backsplash, an expanded appliance package, refinished hardwood flooring and fresh surrounding finishes. The case study below explains how those real project elements were planned and brought together without turning the article into a duplicate kitchen-service page.
Project location: Redmond, Washington
Completed scope: White shaker cabinetry, Pental quartz, glass backsplash tile, appliance coordination, hardwood refinishing, wall preparation, paint and final finish work.
Before and After the Redmond Kitchen Remodel
Move the comparison slider to see the original kitchen and the completed white shaker transformation.


A Kitchen Remodel Designed for Entertaining and Connected to the Rest of the Home
This completed white shaker kitchen remodel in Redmond, WA replaced an older wood-cabinet kitchen with a brighter cabinet layout, two coordinated quartz surfaces, a reflective glass backsplash, a large island and an appliance plan shaped around how the homeowners actually used the house.
The homeowners entertained frequently, so the design included two dishwashers to handle larger gatherings and reduce cleanup bottlenecks. A separate wet bar and coffee area with its own sink created another place for drinks and serving without crowding the primary kitchen work zone.
The project extended beyond the kitchen. Bezruchuk Inc. refinished the downstairs hardwood flooring, worked on the staircase finish and completed fireplace tile so the updated kitchen connected visually with the adjacent living and entry areas.
The progress photographs below document cabinet and countertop installation, stain selection, hardwood refinishing, the wet bar, staircase and fireplace work from this same project.



Cabinet and Island Planning Before Installation
These project images preserve the design direction used to study the cabinet arrangement, island proportions, appliance locations, storage and finish relationships before the completed kitchen was photographed.





Completed Redmond Kitchen and Connected Main-Floor Details
These finished photographs were published with the original project and show the completed white shaker kitchen, large quartz island, glass tile backsplash, wet bar, and staircase finish. Placing them directly after the design images makes it easier to compare the planned cabinet composition with the completed result.






White Shaker Cabinets Created the Foundation for the Remodel
Replacing the older wood cabinets with white shaker cabinetry changed the visual weight of the room and gave the other finishes a cleaner background. The cabinet plan was coordinated around appliance openings, drawer operation, corner storage, countertop support, and the way the kitchen would be used every day.
The cabinet specification documented for this project included 5/8-inch plywood boxes, full plywood backs, dovetail drawers, soft-close tracks, full-overlay doors, and a wood Lazy Susan. A durable painted finish completed the lighter cabinet appearance.
Box construction, drawer joinery, hardware, corner access, fillers, panels, alignment, and appliance clearances all influence how the kitchen performs after installation.
Appliance Openings
Cabinet dimensions were coordinated with the refrigerator, double oven, gas range, ice maker, dishwashers, and hood.
Usable Storage
Drawer operation, corner access, and cabinet placement were considered as functional parts of the layout rather than decorative afterthoughts.
Clean Alignment
Panels, doors, fillers, countertop support, and appliance faces needed to align so the completed kitchen would read as one installation.



Two Dishwashers and a Separate Wet Bar Supported Frequent Gatherings
The homeowners regularly hosted parties and larger gatherings. For this project, two dishwashers were not an unnecessary duplicate; they were a practical response to the amount of glassware, dishes and serving pieces used when the house was full.
A separate wet bar or coffee station with its own sink, countertop and cabinet storage created a secondary service area. Guests could access drinks and coffee away from the main cooking and cleanup zones, while glass-front and tall cabinet storage kept frequently used items organized.
Not every kitchen needs two dishwashers or a separate sink. Here, those features matched the homeowners' entertaining habits and the available space.


Two Quartz Finishes and a Detailed Glass Backsplash
The project used different quartz selections to distinguish the island from the perimeter counters while keeping both surfaces coordinated with the white cabinets, stainless appliances, glass tile, and refinished hardwood.
Soreno Polished by Pental Quartz
The island received Soreno Polished quartz, creating a defined center work surface and a visual contrast with the perimeter counters.
Arezzo Polished by Pental Quartz
Arezzo Polished quartz was used on the main counters around the sink, appliances, and everyday kitchen work zones.
Dunes Glass Platinum Tile
The kitchen backsplash used 3-by-12 Dunes Glass platinum tile from Arizona Tile in a 50/50 offset pattern.
One-Sixteenth-Inch Grout Joints
Narrow grout joints and careful cuts around outlets and edges helped the reflective glass surface look orderly and finished.
Cabinets establish the final template dimensions, quartz creates the finished counter plane, and the backsplash is then laid out against the actual counter, cabinet, outlet, and edge conditions.



The Appliance Package Shaped the Cabinet Plan
The project documentation identifies two dishwashers, an ice maker, a double oven, a large refrigerator, a gas range and a range hood. Those selections affected cabinet openings, panels, utility connections, ventilation, countertop landing areas and door clearances.
Specifications First
Model-specific dimensions are more reliable than nominal appliance widths when cabinets and panels are being finalized.
Utility Coordination
Plumbing, electrical, gas and ventilation requirements had to be considered before surrounding finishes were completed.
Integrated Appearance
Aligning appliance faces with cabinet doors, fillers and panels helped the finished wall read as one planned installation.
That sequence reduced the risk of discovering incompatible openings or clearances after the cabinet package was already installed.
Stain Selection and Refinishing Connected the Kitchen to the Entire Downstairs
The flooring scope was not limited to the kitchen footprint. The downstairs hardwood was refinished so the remodeled kitchen, adjacent living areas and staircase would read as one connected interior rather than a new kitchen surrounded by mismatched older finishes.
Ram Board and taped seams protected the hardwood while cabinets, quartz and other finish work were underway.
Color testing on the floor and staircase helped compare how the stain would read across different grain and lighting conditions.
Refinishing the broader floor area avoided a visible color break at the kitchen openings.
The staircase and railing finish were addressed alongside the floor so the entry and main level felt related.


The Finished Redmond Kitchen From the Main Living Areas
These selected photographs show the completed island, perimeter cabinetry, open connection to the living area and refinished hardwood without repeating every available construction photograph.



Fireplace Tile, Staircase and Living-Area Finishes Extended the Remodel Beyond the Kitchen
Although the kitchen is the primary subject of this case study, the project included additional work visible from the remodeled space. Completing the fireplace tile, staircase finish and adjacent downstairs flooring helped the main level feel intentionally updated rather than divided into unrelated old and new areas.



Four Lessons From This Entertaining-Focused Redmond Remodel
This project shows how a kitchen can be shaped around the homeowners' real routines while still coordinating finishes with the larger home. The same choices would not be necessary in every project.
Two dishwashers and a separate wet bar made sense because these homeowners entertained frequently.
White cabinets, two quartz surfaces, reflective tile, stainless appliances, and walnut flooring create balance through controlled contrast.
Refinishing the downstairs floor, staircase and fireplace area helped the new kitchen connect with the rest of the main level.
Wall preparation, paint, cleaning, alignment, and final adjustments determine whether new materials feel integrated with the room.
What was included in this Redmond kitchen remodel?
The documented scope included white shaker cabinetry, two Pental quartz selections, a 3-by-12 glass tile backsplash, two dishwashers, a separate wet bar or coffee station with sink, downstairs hardwood refinishing, staircase finish work, fireplace tile, painting and final adjustments.
Why did this Redmond kitchen include two dishwashers?
The homeowners entertained frequently and regularly used a larger quantity of dishes and glassware. For this completed project, two dishwashers supported faster cleanup and kept dirty dishes from collecting around the main sink during gatherings.
What was the separate bar area used for?
The separate wet bar or coffee area included its own sink, counter and cabinet storage. It created a secondary place for drinks and serving so guests did not need to enter the primary cooking and cleanup area.
Was the flooring work limited to the kitchen?
No. The downstairs hardwood was refinished, and the staircase finish was coordinated with the main-level flooring. This helped the completed kitchen connect with the entry and adjacent living areas.
Did the project include work outside the kitchen?
Yes. In addition to the kitchen and wet bar, the project included downstairs floor refinishing, staircase finish work and fireplace tile in the connected living area.
Why were white shaker cabinets selected?
The white shaker finish made the kitchen feel brighter and provided a clean background for the quartz surfaces, reflective backsplash, stainless appliances, and walnut-stained hardwood. The cabinet system also included practical construction and storage features.
What cabinet construction was used in the project?
The original project article describes 5/8-inch plywood boxes, full plywood backs, dovetail drawers, soft-close tracks, full-overlay doors, and a wood Lazy Susan. Those details support both durability and daily use.
Why were two quartz colors used?
Soreno Polished quartz was used at the island and Arezzo Polished quartz on the perimeter counters. Using coordinated but different surfaces helped define the island while keeping the kitchen visually connected.
What backsplash tile was installed?
The kitchen used 3-by-12 Dunes Glass platinum tile from Arizona Tile. The tile was installed in a 50/50 offset pattern with one-sixteenth-inch grout joints.
Can existing hardwood be kept during a kitchen remodel?
It may be possible when the floor is in repairable condition and compatible material is available for exposed or damaged areas. In this project, the hardwood was patched where needed, sanded, stained a walnut color, and sealed.
When should appliances be selected for a kitchen remodel?
Appliance models should normally be confirmed before cabinet ordering because exact specifications affect openings, panels, electrical and plumbing connections, ventilation, clearances, and countertop planning.
Does this completed project establish a typical Redmond kitchen-remodel price?
No. The existing article does not provide a verified project cost, and a completed project should not be used as a universal price. Kitchen cost depends on size, cabinet quantity, appliance package, surfaces, flooring, utility changes, permits, and the condition of the existing home.
How can a homeowner start planning a similar kitchen?
Start by documenting the current layout, appliance needs, storage problems, materials to keep, and desired changes. Photos, approximate dimensions, product ideas, and a realistic budget range make the first project review more useful.
Start With the Existing Layout, Appliances, and Materials You Want to Keep
Share the property location, current kitchen photos, approximate dimensions, desired cabinet and appliance changes, and your planning budget. Bezruchuk Inc. will review the scope and determine whether the project is a good fit.